Project ile soleil
Ile Soleil is 123,000 square metres of reclaimed island at Anse Aux Pins, in the eastern district of the main island of Mahé. The new island is mainly designated for residential development along with some commercial plots.
This month sees the commencement of the ground infrastructure work including; the provisions of water, electricity, roads, pavements, drains, street lights, sewage, telecommunication ducts, bridges, added reclamation work, public parking and garden spaces.
United Concrete Products Seychelles (UCPS) won the contract to carry out these major works alongside engineering company GIBB (Seychelles). The infrastructure works are due to be completed by December 2015.